Hydroseeding & erosion control in Colorado

From bare dirt to healthy, green growth.

Premier Hydroseeding Solutions provides quality growth and reliable service for residential, commercial and new construction projects. Proudly serving Colorado Springs and surrounding areas.

  • Residential
  • Commercial
  • New construction
Fresh green hydroseed mulch covering a slope beside a large water tank
On the job
The process

How a job comes together

  1. 01

    Tell us about the site

    Send a quote request or give us a call. Measure the area on our map if you can, or we will measure it on site.

  2. 02

    Prep the ground

    We grade, clear and top dress the soil with our skid steer so the seed has a good bed to root into.

  3. 03

    Spray and protect

    Seed, mulch, fertilizer and tackifier go down in one even coat. Slopes and channels get straw blankets or wattles where they need them.

  4. 04

    Watch it grow

    You get our watering guide so the new seed takes. Most areas show sprouts in one to three weeks.

Start to finish

Prepped, then sprayed

A mountain site we top dressed with the skid steer, lined with a rock channel, then hydroseeded with erosion control along the edges.

See more projects
Freshly top dressed soil with a rock-lined drainage channel through an aspen forest
Top dressed
The same rock channel with green hydroseed mulch sprayed on both sides
Hydroseeded
Free tool

How big is your project?

Trace your yard, slope or lot on a satellite map and get the square footage in about a minute. Send it with your quote request and we can price it faster.

Questions

Hydroseeding FAQ

Already have seed down? Our watering guide walks you through the first six weeks.

Why is hydroseed green?

The mulch is dyed green so we can see exactly where it has been sprayed and get even coverage. The color fades over a week or two as the seed starts to come up.

How long until I see grass?

With steady watering, most grass seed sprouts in one to three weeks, depending on the seed mix and the weather. Most lawns are ready for their first mow in about four to six weeks.

Hydroseed or sod?

Hydroseeding usually costs much less than sod, covers large and sloped areas easily, and roots straight into your own soil. Sod looks finished on day one. For most yards, slopes and lots, hydroseed is the better value.

When is the best time to hydroseed in Colorado?

Spring and late summer into early fall are ideal, when the soil is warm and nights are cool. We can seed through much of the season as long as the new seed can be watered. Ask us about your timing.

Do I need to prepare the ground first?

Seed grows best in loose, level soil. We can handle the prep, including grading and top dressing with our skid steer, or seed ground your builder or landscaper already prepared.

Do you take commercial and construction jobs?

Yes. We work on residential, commercial and new construction projects, including site stabilization with straw blankets and wattles.

How do you price a job?

Mostly by square footage, plus any prep, erosion control and how easy the site is to reach. Measure your area on our map and send it with your quote request to speed things up.

Ready to get it growing?

Tell us about your project and we will get back to you with a quote.